CLIENT
CLIENT
Saint-Gobain
PROJECT
INTERNI CRE-ACTION
DATE
2025
The external structure
is formed by the intersection of two volumes at different heights, and is
characterised by a light construction system of cold-pressed steel and fibre
reinforced gypsum slabs, dynamic and flexible, with an anthracite coloured
box that acts as a covering for the corten core which, with its oxidised
materiality, speaks of time and resistance.
The metal casing invites entry with a perimeter LED, which opens up access
to another dimension.
There was a time when the Golden Age evoked images of prosperity and
progress. But today, is the future really built on precious surfaces, or rather
on materials capable of transformation and durability?
Studio Marco Piva’s installation for Saint-Gobain invites exploration.
Two boxes, one emerging from the other, prompt the questioning about the
possibilities of materials, in their many variations and finishes. A responsible
architecture made entirely of materials from Saint-Gobain’s vast offer,
introduces us to a new world of experimentation.